Alabama Southern train 131 begins to climb uphill at 5MPH to rejoin with the old L&N track alignment that would send them back to Brookwood. The track to the right continues down to Nucor Steel in... (more)
Built in June of 1980, WAMX EMD GP50 is still on the rails handling some yard tasks in Tuscaloosa, AL for the Alabama Southern Railway (ABS). The unit was originally built for the C&NW as their 50... (more)